Menu
Log in


Intervention & Coiled Tubing Association Canadian Chapter

  • Home
  • News
  • DACC IRP Volume #21 - Coiled Tubing Operations

DACC IRP Volume #21 - Coiled Tubing Operations

09 Nov 2021 3:19 PM | Craig Fraser (Administrator)

IRP 21 was opened for a full scope review in March 2018. Approval was provided by the DACC to remove drilling sections of the document during this review. The complete details of the revisions can be found in Appendix A of the document.
  https://www.energysafetycanada.com/Resource/DACC-IRP-Volumes/DACC-IRP-Volume-21-Coiled-Tubing-Operations
Coiled tubing operations are upstream petroleum industry operations using specialized equipment to carry out workovers and drilling on oil and gas wells. Coiled tubing applications fit into two general categories: fluid conveyance applications (pumping) such as fracturing/acidizing a formation, removing sand, scale or wax and mechanical applications such as cutting tubulars or setting a plug or packer.

The IRP includes information about coiled tubing operations including recommendations for:

  • Operations planning
  • Well Control Equipment
  • Accumulator Equipment
  • Coiled tubing specifications
  • Fluids and circulating systems
  • QA for Well pressure control equipment
  • Elastomeric seals
  • Well servicing operations

Developer: DACC
Sponsor Organization: CAPP and PSAC
Current Status: Sanctioned September 15, 2021
Feedback:To provide feedback or comments on the IRP 21 document email Safety@energysafetycanada.com.


ICoTA Canadian Chapter
PO Box 22050 Bankers Hall
Calgary, AB T2P 4J1

Powered by Wild Apricot Membership Software